Refurbishments


SUFFOLK HOUSE, WHITFIELD STREET, LONDON W1
This scheme involved the refurbishment of an existing vacant warehouse into 13 social housing flats of mixed tenure in a conservation area.

As Employer’s Agent we surveyed the existing building at length to enable a virtually unconditional D&B tender to be obtained, with a subsequent Final Account level of within 2% of the Contract Sum.

180-186 KINGSTON ROAD, NEW MALDEN, SURREY
The refurbishment of the existing 1 st and 2 nd Floor offices into 10Nr residential flats was carried out under the Local Authority Planning Department’s Permitted Development scheme for a private client. The project was split into two phases with 5Nr flats being completed in Phase 1 and the remaining 5Nr in Phase 2.

As the Quantity Surveyors on the scheme, we produced the Phase 1 Tender Documents for a competitive tender and subsequently the second phase of this project was undertaken through a negotiation with the original successful contractor.

113 CROUCH HILL, CROUCH END, LONDON N8 9QN
The scheme comprised a £500,000 conversion and total refurbishment of an existing vacant nursery building into a modern day children’s nursery. We acted as Contract Administrator under a JCT Minor Works Form of Contract. The contract duration was 9 months and the Final Account was agreed at only 3% above the Contract Sum and this overspend was due to a change of Employer policy regarding the extent of the external works undertaken.

WHAT WE OFFER
Drake & Reynolds combine qualified staff from both sides of the construction industry to provide bespoke services for a varied range of clients
  • Quantity Surveying
  • Project Management
  • Party Wall Surveying
  • Contract Administration
read more 

Links | Site Map
Copyright © 2007 Drake & Reynolds
All Rights Reserved
Web Design by nutts.net